# Apartment renovation in Croatia: check underfloor heating screed before laying floors

> How to check underfloor heating screed, expansion joints, and leveling before laying parquet or LVT during an apartment renovation in Croatia.

- Canonical URL: https://bldr.hr/blog/apartment-renovation-croatia-underfloor-heating-screed-checks/
- Language: en
- Page type: article
- Primary topic: underfloor heating screed leveling croatia
- Audience: foreign property owners, buyers and investors in Croatia
- Intent: informational

## Page content

Laying parquet or large-format tiles over underfloor heating requires a flawless screed. Verifying curing times, expansion joints and moisture levels before the flooring goes down prevents cracked tiles and lifted parquet later.

## Confirm the heating protocol is complete

Before any floor covering is laid, the screed must go through a strict heating protocol. This process gradually increases and decreases the temperature over several weeks to release stress and residual moisture. Skipping this step during an apartment renovation often leads to cracking later.

## Check moisture levels before laying parquet

Even after curing, the screed must be tested for moisture, typically using the CM (Carbide Method) test. For parquet over underfloor heating, the moisture limit is extremely strict (usually under 1.8% for cement screed). Never let the installer guess the moisture level based on time alone.

## Verify expansion joint placement

Heated screeds expand and contract. Expansion joints must be correctly placed at doorways, between different heating zones, and across large rooms. If these joints are bridged by rigid tiles without proper uncoupling, the tiles will eventually crack.

## Ensure compatibility of leveling compounds

If the screed requires self-leveling compound before laying LVT or thin tiles, the compound must be explicitly rated for underfloor heating. Using standard filler will cause it to delaminate and turn to dust under the thermal stress.

## Inspect the surface for strength and cleanliness

The screed surface must be hard, free of dust, and without loose top layers. A scratch test can confirm its strength. If the surface is friable, it must be mechanically sanded and primed before any adhesive is applied. For help coordinating these critical phases, contact our experts .

## Apartment Renovation in Croatia

Complete apartment renovation with one responsible partner

## Contact and verification

- For price, timing, availability or a project-specific commitment, contact BLDR.HR; this page is not a proposal or contract.
- Email: info@bldr.hr
- Telephone: +44 777 68 00005