# Hidden Skirting Boards and Shadow Gaps

> Learn how to plan flush hidden skirting boards and shadow gaps in Croatian interior design projects before plastering and floor screed.

- Canonical URL: https://bldr.hr/blog/hidden-skirting-boards-shadow-gap-croatia/
- Language: en
- Page type: article
- Primary topic: hidden skirting boards flush wall croatia
- Audience: foreign property owners, buyers and investors in Croatia
- Intent: informational

## Page content

A common myth in interior design is that flush skirting boards are simply glued to the wall at the end of the project. In reality, a hidden skirting board requires an aluminum profile to be recessed into the wall before the wet plastering begins. Failing to plan this detail early means you will have to cut into finished walls, leading to uneven lines and compromised structural integrity.

## Select Skirting Height Early

The exact height of the hidden skirting board must be chosen before construction begins. The recessed aluminum profile needs to match this dimension precisely to ensure a seamless flush finish with the wall above.

## Install Profiles Before Plastering

The base aluminum profile must be fixed to the raw masonry or drywall before the plasterers arrive. The plaster is then floated down to the top edge of the profile, creating a perfect shadow gap and a flush surface.

## Planning hidden skirting boards?

Coordinate the skirting detail with doors, finished floor levels and wall finishes as part of the interior design, before the work conceals the junctions.

Planning a wider apartment renovation?

## Coordinate Screed Height

The floor screed (glazura) must be poured to a precise level relative to the bottom of the aluminum profile. The final floor covering (e.g., parquet or tiles) should slide neatly under the profile, leaving a tiny expansion gap.

## Leave Room for Expansion

Wooden floors naturally expand and contract with temperature and humidity changes. The recess must be deep enough to allow the parquet to move underneath the skirting board without buckling.

## Insert Skirting After Painting

The actual decorative skirting board (whether MDF, wood, or metal) is the very last element to be installed. It simply clicks or glues into the pre-installed aluminum profile after all painting and floor finishing is complete.

## Contact and verification

- For price, timing, availability or a project-specific commitment, contact BLDR.HR; this page is not a proposal or contract.
- Email: info@bldr.hr
- Telephone: +44 777 68 00005
