# Renovating an apartment in Rijeka: what to check first

> What to check before renovating an apartment in Rijeka: moisture, installations, building logistics, access, waste removal, timelines and budget.

- Canonical URL: https://bldr.hr/blog/renovating-an-apartment-in-rijeka-checklist/
- Language: en
- Page type: article
- Primary topic: renovating apartment in Rijeka checklist
- Audience: foreign property owners, buyers and investors in Croatia
- Intent: informational

## Page content

Before a renovation in Rijeka it is important to check not only the apartment itself, but also the building logistics, moisture, ventilation and the state of installations.

## Technical review

Old installations, moisture and ventilation, substrates and walls, and the possibilities for layout changes.

## Building logistics

Access and the lift, protection of common areas, waste removal, working hours and neighbours. The city centre can be demanding because of parking and building rules.

## Documents and data

A floor plan, photos, a description of the goal, timelines and priorities — that is the first package to send to the contractor.

## Apartment Renovation in Croatia

Complete apartment renovation with one responsible partner

## Contact and verification

- For price, timing, availability or a project-specific commitment, contact BLDR.HR; this page is not a proposal or contract.
- Email: info@bldr.hr
- Telephone: +44 777 68 00005
