# What to Coordinate Before Releasing Custom Windows for Production

> Learn what to align before ordering apartment windows: installer site measurements, finished floor levels, drawing revisions, and clear responsibilities before manufacturing.

- Canonical URL: https://bldr.hr/blog/window-order-approval-checklist-before-manufacture-croatia/
- Language: en
- Page type: article
- Primary topic: checking measurements before ordering apartment windows
- Audience: foreign property owners, buyers and investors in Croatia
- Intent: informational

## Page content

Before ordering custom windows for an apartment, confirming precise site measurements by the responsible installer, establishing finished floor levels, and approving drawing revisions are essential to prevent costly errors.

## Window Schedule and Division of Responsibilities Before Ordering

Before ordering windows for an apartment, a clear window schedule must be established that includes position codes, room assignments, existing conditions, and designated roles for site measurements, technical specifications, and final approvals. The appointed supplier or installer is responsible for accurate manufacturing dimensions and technical profile suitability, while the owner approves configuration, finish color, and drawing revisions within agreed boundaries. BLDR assists through overall apartment renovation management by coordinating communication and sequence of work, without undertaking manufacturing, certified installation, or window brand dealership.

## Difference Between Rough Opening Measurements and Manufacturing Dimensions

Approximate rough measurements, actual site opening dimensions, and final window unit dimensions are distinct values. Their precise relationship depends on the profile system and existing wall conditions, so the responsible supplier or installer independently determines site installation tolerances. Just as [final site measurement and approval drawings for built-in furniture](https://bldr.hr/blog/built-in-furniture-final-measurement-before-production-croatia/) require a dedicated coordination workflow, exterior joinery demands its own verification before fabrication, without assuming interior furniture tolerances apply to perimeter windows.

## Apartment Renovation

Complete apartment renovation with one responsible partner

## Finished Floor Level Coordination and Drawing Revisions

Before releasing an order into production, the finished floor level, sill heights, threshold details, jamb conditions, and wall lining finishes must be coordinated with on-site contractors. An illustrative example is opening W01 in the living room: drawing revision R2 was placed on hold because the finished floor level had not been established. The responsible installer subsequently updated the site data in revision R3, after which designated parties confirmed their selections and technical fields prior to ordering. Property owners are not expected to independently calculate or alter structural building openings, as technical sizing remains the installer's responsibility.

## Opening Direction, Hardware, and Spatial Function Checks

Supplier production drawings must clearly illustrate sash swing direction, handle positions, clearance for circulation, and provisions for integrated roller shutters or insect screens. Building physics, thermal performance, and required air exchange should be assessed by the owner with a qualified specialist, without making generic assumptions about joinery types or standards. If the renovation involves a traditional masonry building, key considerations are outlined in our guide on [stone house new windows: ventilation check](https://bldr.hr/blog/stone-house-renovation-croatia-new-windows-ventilation-check/), ensuring all functional criteria are aligned before final production sign-off.

## Final Checklist Before Order Sign-Off

Before final signature, review the sign-off checklist: opening and room designations, measurement date and responsible surveyor, manufacturing dimensions with floor datums, selected profile and accessories, exact drawing revision number, and the designated approving party. Agree in advance with contractors on site delivery terms, pathway access, storage, surface protection, and the scope of perimeter jamb finishing. Share your floor plan, site photos, window schedule, and open questions so BLDR can evaluate joinery order coordination as part of a comprehensive apartment renovation.

[Share your architectural drawings and coordinate your window order within your apartment renovation.](https://bldr.hr/apartment-renovation-croatia/?from_article=%2Fblog%2Fwindow-order-approval-checklist-before-manufacture-croatia%2F)


## Contact and verification

- For price, timing, availability or a project-specific commitment, contact BLDR.HR; this page is not a proposal or contract.
- Email: info@bldr.hr
- Telephone: +44 777 68 00005
