# Project brief and design intent

> DEMO · Illustrative project · Project brief and design intent · Villa Kvarner · Opatija / 2026-014 · 29 October 2026

- Canonical URL: https://bldr.hr/portal/demo/files/P-019-C-en.html
- Language: en
- Page type: article
- Primary topic: Project brief and design intent
- Audience: Property owners exploring a project management demonstration
- Intent: informational / project_management_demo

## Page content

Villa Kvarner · Opatija / 2026-014

## Project scope

A 120 m² garden residence within an existing Opatija villa, plus a 24 m² terrace. The original structure stays; interiors, services and finishes are renewed.

- Renew interiors and services within the retained 1930s shell.

- Restore four exterior timber opening units; retain their original geometry.

- Fit kitchen, sanitaryware, storage and basic furniture to the room schedule.

- Waterproof and repave the 24 m² terrace; protect the existing garden and balustrade.

No new-build, pool, structural extension or whole-villa roof replacement.

## Room schedule

## Design proposals

L01 · 12 Sept 2026 Design proposal Living-zone design target Proposed finishes and furniture layout for the living zone.

W01 · 12 Sept 2026 Design proposal Bathroom design target Proposed sanitaryware and finishes, awaiting selection approval.

T01 · 12 Sept 2026 Design proposal Terrace option A — pending selection Warm-stone finish option A, pending decision D-021 (€2,400).

## Contact and verification

- For price, timing, availability or a project-specific commitment, contact BLDR.HR; this page is not a proposal or contract.
- Email: info@bldr.hr
- Telephone: +44 777 68 00005
