# Programme and hold points

> DEMO · Illustrative project · Programme and hold points · Villa Kvarner · Opatija / 2026-014 · 29 October 2026

- Canonical URL: https://bldr.hr/portal/demo/files/S-003-B-en.html
- Language: en
- Page type: article
- Primary topic: Programme and hold points
- Audience: Property owners exploring a project management demonstration
- Intent: informational / project_management_demo

## Page content

Villa Kvarner · Opatija / 2026-014

## Programme

- 6 Aug 2026 — 20 Aug 2026 Completed Survey and scope 100% Concept brief, room schedule and retained fabric recorded. 100%

- 21 Aug 2026 — 12 Sept 2026 Completed Design and coordination 100% Design proposals and work packages coordinated. 100%

- 14 Sept 2026 — 5 Oct 2026 Completed Strip-out and first-fix 100% Original structural shell retained; local substrate, services and wet-zone preparation completed. 100%

- 6 Oct 2026 — 27 Nov 2026 In progress Interiors and fitted joinery 40% Current phase: finishes, kitchen installation and outstanding client selections. 40%

- 30 Nov 2026 — 12 Dec 2026 Planned Testing, snagging and handover 0% Planned final checks, documentation, cleaning and handover. 0%

## Inspection points

- HP-01 · 29 Sept 2026 Completed Services before covering Review pressure-test and electrical inspection records before covering services.

- HP-02 · 5 Oct 2026 Completed Wet-zone membrane before tiles Check corners, penetrations and drainage before tiling.

- HP-03 · 27 Oct 2026 Completed Moisture / finish release Moisture check and flooring approval before oak installation.

- HP-04 · 12 Nov 2026 Scheduled Final electrical and system checks Planned qualified checks and commissioning before handover.

## Next seven days

- Confirm terrace option D-021 by 3 November before releasing the final stone order.

- Confirm bathroom finish D-022 by 5 November within the existing allowance.

- Continue kitchen fronts and worktop templating; keep floor protection in place.