# Renovation in Istria

> A stone house near Buje and a rental flat in Pula need different renovation plans. For an older house we start with the roof, wall condition and moisture. For a rental apartment we check installations, durable finishes and when the property needs to be ready.

- Canonical URL: https://bldr.hr/renovation-istria-croatia/
- Language: en
- Page type: location_page
- Primary topic: Renovation in Istria
- Audience: foreign property owners, buyers and investors in Croatia
- Intent: local / commercial_investigation

## Page content

AI-generated illustration.

## Stone houses and rental properties from the coast to the interior

A stone house near Buje and a rental flat in Pula need different renovation plans. For an older house we start with the roof, wall condition and moisture. For a rental apartment we check installations, durable finishes and when the property needs to be ready.

Tell us about your project

## How it works?

01 Survey the existing stonework +

Record the condition of the walls, roof and timber. Identify what can be retained and what needs a specialist assessment.

02 Plan around the property's use +

For homes in Rovinj, Poreč, Umag, Labin and inland Istria, separate essential repairs from fit-out and agree the handover date before ordering finishes.

## Prepare a faster first assessment

Tick what you already have. You can still send an inquiry with an incomplete set.

" A renovation goes well when decisions are made before the site starts: scope, materials, installations and responsibilities. That is the process we run for every project in Croatia. "

Tell us where the property is, whether it is a stone house or an apartment, and how you plan to use it.

## Related services

## Contact and verification

- For price, timing, availability or a project-specific commitment, contact BLDR.HR; this page is not a proposal or contract.
- Email: info@bldr.hr
- Telephone: +44 777 68 00005
