# Renovation Site Survey in Croatia

> Book a standalone renovation site survey in Croatia. Get dimensioned plans, an annotated photo record and options for a cost estimate or private 3D tour.

- Canonical URL: https://bldr.hr/renovation-site-survey-croatia/
- Language: en
- Page type: service_landing
- Primary topic: renovation site survey Croatia
- Audience: foreign property owners, buyers and investors in Croatia
- Intent: commercial_investigation / lead_generation

## Page content

## Measured plans and a photo record before you renovate

Book a standalone visit to measure agreed areas and record visible conditions in your apartment or house. Add a staged renovation estimate or a private 3D walkthrough so you can review the property online.

## Prices and how we calculate them

### Specialist time · €45/h

One hourly rate for the inspection, document preparation and agreed travel time. The quote shows estimated hours by task and each leg of the route.

### Measured survey · Example €225

5 hours for the inspection, dimensioned floor plans and an annotated photo record. Travel is shown separately.

### Survey and renovation estimate · Example €360

The measured survey plus 3 h × €45/h (€135) to calculate quantities and price the work by stage. Travel is shown separately.

### Private 3D walkthrough · From €250 extra

Optional capture during the same visit. The quote lists capture, processing and the included hosting period.

### Example: measured survey with a three-hour round trip

### Hvar example: Split to Stari Grad and back

The example covers a small property on one level with straightforward access and a limited renovation scope.

Ferry tickets use Jadrolinija’s November 2026 fare for a car up to 5 m long and 2 m high and one driver. Work hours and the time for road travel and boarding are illustrative. We confirm the route, waiting time and any tolls or parking before booking. Jadrolinija fare and timetable

Ferry tickets, tolls and parking are listed separately at cost when applicable. We agree the departure point, route, travel time and estimated work hours before booking. For an island visit, the travel estimate includes the crossing and any scheduled waiting time shown in the quote. We confirm any extra work or additional visit with you in advance.

## What we check on site

The proposal defines which of these items apply to your project.

### Rooms and openings

Measure the agreed accessible rooms, floor areas and key openings.

### Visible defects and rainwater routes

Photograph visible damp and damage, record locations and measure affected areas where practical. Review accessible terraces, downpipes and drainage where relevant.

## What you’ll get

- PDF floor plans with room dimensions, key openings and areas for the agreed spaces.

- An annotated photo record organised by room or exterior location, with defect measurements where practical.

- With the estimate package, a breakdown by stage and trade with quantities, labour costs and separate material allowances. Items that need further checks are marked.

- With the 3D option, a private walkthrough link. The quote specifies the captured spaces and how long the link is hosted.

## Agree responsibilities and exclusions

The visit covers visible conditions in agreed accessible areas. Specialist testing, opening up, structural assessment and permit drawings are quoted separately where needed. The 3D tour is a visual record for remote review.

## Request a survey quote

Send the location, approximate size and the package you need. We’ll confirm the scope and fee before booking.

## How it works?

01 Share the property details +

Send a map pin, approximate floor area, number of levels and your preferred package.

02 Agree the price and access +

We confirm the scope and fee in writing. A keyholder can provide access if you are abroad.

03 Receive your survey package +

We send the plans and photo record, plus the estimate and private tour link if ordered.

## Prepare a faster first assessment

Tick what you already have. You can still send an inquiry with an incomplete set.

" A renovation goes well when decisions are made before the site starts: scope, materials, installations and responsibilities. That is the process we run for every project in Croatia. "

## Related services

## Contact and verification

- For price, timing, availability or a project-specific commitment, contact BLDR.HR; this page is not a proposal or contract.
- Email: info@bldr.hr
- Telephone: +44 777 68 00005
