Apartment renovation scope of works in Croatia
A clear scope of works protects the budget. The owner should know what is included, what is optional and which technical risks can change the plan.
Separate rooms, trades and hidden works
Demolition, electrical works, plumbing, bathroom waterproofing, kitchen positions, floors, wall preparation, painting and furniture should not be one vague line. Each phase needs responsibilities and decision points.
Design choices affect construction cost
Moving a kitchen, changing a bathroom layout, adding lighting scenes or selecting large-format tiles changes installation and finishing work. That is why interior decisions should be checked before the cost estimate is treated as final.
What to send before asking for a quote
Photos of every room, a floor plan, building limitations, desired deadline, target use and known defects. With that, BLDR.HR can prepare a scope review before the renovation becomes a site problem.