Dry Screed Solutions for Old Timber Floors

Aug 2026
BLDR.HR
Dry screed timber floor renovation Croatia — old apartment timber floor renovation using a dry screed system and leveling…

Renovating old town apartments in Croatia often means dealing with uneven, sagging timber joist floors. Traditional wet concrete screeds are too heavy and introduce dangerous moisture. Lightweight dry screed systems are the correct technical solution for stabilizing and leveling these historic floors.

Assess the timber joist condition

Before applying any new floor system, expose and thoroughly inspect the existing timber joists. Check for rot, woodworm, or severe deflection. Any compromised structural timber must be reinforced or replaced by a qualified professional before leveling begins.

Use dry leveling granules

To correct significant height differences and unevenness, use specialized dry leveling clay granules rather than wet mortar. These granules are lightweight, provide excellent acoustic insulation, and can be easily screeded to a perfectly flat plane without introducing any moisture into the building.

Your next step

Renovating an apartment with an older timber floor?

Include the existing floor condition, planned layers and finished levels in the overall renovation scope. The floor decision should connect to the rest of the apartment work.

Plan the scope of your apartment renovation

Need to coordinate floor finishes and interior details?

Install interlocking gypsum fiber boards

Over the leveled granules, install heavy-duty, interlocking gypsum fiber boards (like Fermacell or Knauf Brio). These boards distribute the load evenly across the floor and create a rigid, floating subfloor that is immediately ready for final finishes without waiting weeks for drying.

Plan for acoustic decoupling

Old timber floors are notorious for transmitting impact noise. Ensure an edge insulation strip is installed around the entire perimeter of the room to acoustically decouple the new floating dry screed from the structural walls, preventing sound flanking.

Coordinate final floor heights

Dry screed systems, especially with leveling granules, will raise your final floor height. Check the clearance for existing doors, balcony thresholds, and stair landings early in the design phase. Contact us for technical renovation planning that addresses historic building challenges safely.

No items found.