Hidden Skirting Boards and Shadow Gaps

A common myth in interior design is that flush skirting boards are simply glued to the wall at the end of the project. In reality, a hidden skirting board requires an aluminum profile to be recessed into the wall before the wet plastering begins. Failing to plan this detail early means you will have to cut into finished walls, leading to uneven lines and compromised structural integrity.
Select Skirting Height Early
The exact height of the hidden skirting board must be chosen before construction begins. The recessed aluminum profile needs to match this dimension precisely to ensure a seamless flush finish with the wall above.
Install Profiles Before Plastering
The base aluminum profile must be fixed to the raw masonry or drywall before the plasterers arrive. The plaster is then floated down to the top edge of the profile, creating a perfect shadow gap and a flush surface.
Planning hidden skirting boards?
Coordinate the skirting detail with doors, finished floor levels and wall finishes as part of the interior design, before the work conceals the junctions.
Explore interior design and executionCoordinate Screed Height
The floor screed (glazura) must be poured to a precise level relative to the bottom of the aluminum profile. The final floor covering (e.g., parquet or tiles) should slide neatly under the profile, leaving a tiny expansion gap.
Leave Room for Expansion
Wooden floors naturally expand and contract with temperature and humidity changes. The recess must be deep enough to allow the parquet to move underneath the skirting board without buckling.
Insert Skirting After Painting
The actual decorative skirting board (whether MDF, wood, or metal) is the very last element to be installed. It simply clicks or glues into the pre-installed aluminum profile after all painting and floor finishing is complete.