Renovation on Hvar Island

Renovation on Hvar Island — house with a stone lower storey and terrace inspired by Stari Grad

AI-generated illustration.

Plan the survey, damp investigation and work in stages

For houses and apartments in Stari Grad, Jelsa, Hvar town and elsewhere on the island, we can arrange access through a local keyholder. Where damp is visible, we record affected surfaces and look at terraces, downpipes and ground levels before planning interior finishes.

Tell us about your project

How it works?

01Make the site visit count

Agree access to each relevant level, outdoor area and utility point before booking the trip. Record the dimensions needed for the proposed scope.

02Separate repairs from fit-out

Price visible work by stage and flag areas that need further investigation, such as an enclosed floor build-up.

Prepare a faster first assessment

Tick what you already have. You can still send an inquiry with an incomplete set.

" A renovation goes well when decisions are made before the site starts: scope, materials, installations and responsibilities. That is the process we run for every project in Croatia. "

BLDR.HR
Design-build team
Conclusion

Share the village or a map pin, photos of affected areas and whether someone on the island can let us in.

Tell us about your project

Required: enter your name and either an email address or phone number.

Thank you. Your inquiry has been received.
Something went wrong while sending the inquiry.