Renovation on Korčula Island

Renovation on Korčula Island — stepped stone lane and green shutters inspired by Korčula

AI-generated illustration.

Renovation logistics for stepped lanes and older homes

From Korčula town to Blato and Vela Luka, the unloading point can be some distance from the front door. For older houses we check the route for carrying materials, waste removal, and which masonry and timber elements the owner wants to retain.

Tell us about your project

How it works?

01Measure the last stretch on foot

Check steps, turns and door openings before selecting large-format tiles, sanitary fittings or joinery.

02Allow for work on existing fabric

Record original finishes and visible defects. Check whether specialist input is needed before opening up walls or floors.

Prepare a faster first assessment

Tick what you already have. You can still send an inquiry with an incomplete set.

" A renovation goes well when decisions are made before the site starts: scope, materials, installations and responsibilities. That is the process we run for every project in Croatia. "

BLDR.HR
Design-build team
Conclusion

Tell us the settlement, how far a vehicle can get and which parts of the property you want to keep.

Tell us about your project

Required: enter your name and either an email address or phone number.

Thank you. Your inquiry has been received.
Something went wrong while sending the inquiry.