The bathroom is the most technically sensitive room in a renovation. A good result depends on the sequence of works, waterproofing, installations, floor slopes, ventilation and precise finishing. BLDR.HR runs bathroom renovation as a controlled process: demolition and preparation, plumbing and electrical works, waterproofing and tiling, sanitary installation and final details — with hidden phases checked before layers close.

What the bathroom renovation scope can include

The proposal defines which of these items apply to your project.

Existing condition and layout

Review the room, existing installations, access and intended layout before defining demolition and new work.

Plumbing and electrical coordination

Agree fixture positions, water and drainage routes, lighting and power requirements with the relevant trades.

Waterproofing and finishes

Coordinate substrate preparation, waterproofing interfaces, tiling layout and finishing details before surfaces are closed.

Fixtures and completion

Define installation of sanitaryware, furniture interfaces, final checks, cleaning and handover in the agreed scope.

What you should have at the agreed stages

  • An itemized scope separating work, materials and open decisions for the quotation.
  • Agreed fixture and finish decisions, with changes recorded before they affect the work.
  • A handover review of the agreed work, outstanding items and available product documentation.

Discuss your bathroom renovation

Tell us the location, approximate size and whether you want to change the layout. Photos or a plan are useful if available.

Discuss your bathroom renovation

How it works?

01Review the room

Share the location, photos and approximate dimensions. Identify existing problems and whether the layout will change.

02Agree scope and selections

Separate demolition, installations, waterproofing, finishes and fixtures. Record supply responsibilities and decisions needed before ordering.

03Coordinate the work

Sequence the trades and agree checks before concealed work is covered. Record changes to scope, cost and timing.

04Review and hand over

Review the agreed work with the owner, list open items and collect available product and maintenance information.

Prepare a faster first assessment

Tick what you already have. You can still send an inquiry with an incomplete set.

" A renovation goes well when decisions are made before the site starts: scope, materials, installations and responsibilities. That is the process we run for every project in Croatia. "

BLDR.HR
Design-build team
Conclusion

Tell us the location, approximate size and whether you want to change the layout. Photos or a plan are useful if available.

Discuss your bathroom renovation