Bathroom renovation: order of works and common mistakes
A bathroom leaves the least room for improvisation. Problems with slopes, waterproofing, ventilation and installations often show up only when the repair is already expensive.
The typical sequence
Demolition, installation checks, rough works, waterproofing, tiling, sanitary installation and final details. Tiles are chosen before execution because the format changes details, cuts and sequence.
The most common mistakes
An unclear layout before demolition, skipped waterproofing, poor ventilation and mismatched heights and slopes. The most critical phase is waterproofing and checking installations before surfaces are closed.
How to reduce the risk
Check installations early, agree the tiles before works start, photograph hidden phases and never close layers before an inspection.