Kitchen Island Installations: Planning Before the Screed

A kitchen island needs power, water, and drainage routed through the floor. The exact position of these pipes must be secured before the floor screed (estrih) is poured. Delaying this decision means drilling into finished floors, compromising insulation, and risking water leaks in the new apartment.
The Danger of Late Decisions
Many owners assume a kitchen island can be added as an afterthought. However, running a 50mm drain pipe requires sufficient depth in the floor build-up to maintain the correct slope. Once the screed is poured, adding an island means cutting a trench through the new floor, destroying the waterproofing and acoustic layers.
Pinpointing the Location
The exact location of the island must be marked on the concrete slab. Water supply, drainage, and electrical conduits must emerge exactly where the island cabinetry will cover them, but clear of appliances like dishwashers that require zero back-clearance.
Electrical Requirements
An island often needs multiple dedicated circuits: one for the induction hob, one for the oven, general sockets, and perhaps a wine cooler. Routing these thick cables through the floor insulation layer protects them and keeps the walls clear.
Securing and Protecting
Before the screed is poured, all pipes must be pressure-tested, rigidly secured to the concrete slab, and photographed with a tape measure for reference. This prevents them from shifting when the heavy screed is pumped over them.
Apartment Renovation in Croatia
Complete apartment renovation with one responsible partner
Explore Apartment Renovation in Croatia