Itemised base BOQ and approved change
Villa Kvarner · Opatija / 2026-014
- Items
- 62
- Approved total
- €248,500.00
- Available reserve
- €12,000.00
Work packages, quantities and unit rates for this project. Amounts in EUR; VAT is shown separately.
Survey, design and preliminaries
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-001Survey and measured brief | 120 | m² | €8.00 | €960.00 | €240.00 | €1,200.00 |
| B-002Interior and services coordination | 120 | m² | €28.00 | €3,360.00 | €840.00 | €4,200.00 |
| B-003Protection of common areas and existing joinery | 1 | lot | €1,800.00 | €1,800.00 | €450.00 | €2,250.00 |
| B-004Temporary site logistics | 16 | week | €170.00 | €2,720.00 | €680.00 | €3,400.00 |
Including VAT€11,050.00
Strip-out and waste
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-005Lift existing floor finishes | 120 | m² | €22.00 | €2,640.00 | €660.00 | €3,300.00 |
| B-006Remove old wet-area tiles and fittings | 60 | m² | €25.00 | €1,500.00 | €375.00 | €1,875.00 |
| B-007Remove non-load-bearing partitions | 24 | m² | €35.00 | €840.00 | €210.00 | €1,050.00 |
| B-008Waste removal, six small collections | 6 | load | €320.00 | €1,920.00 | €480.00 | €2,400.00 |
Including VAT€8,625.00
Floor substrate and moisture control
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-009Local slab repairs | 40 | m² | €35.00 | €1,400.00 | €350.00 | €1,750.00 |
| B-010Floor moisture barrier and thermal insulation | 120 | m² | €36.00 | €4,320.00 | €1,080.00 | €5,400.00 |
| B-011Heating screed and levelling | 120 | m² | €30.00 | €3,600.00 | €900.00 | €4,500.00 |
Including VAT€11,650.00
Mechanical, electrical and plumbing
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-012Electrical first-fix and testing, excluding visible fittings | 120 | m² | €72.00 | €8,640.00 | €2,160.00 | €10,800.00 |
| B-013Distribution board | 1 | item | €1,900.00 | €1,900.00 | €475.00 | €2,375.00 |
| B-014Water and waste rough-in, three wet zones | 3 | zone | €1,800.00 | €5,400.00 | €1,350.00 | €6,750.00 |
| B-015Accessible drainage branches | 15 | m | €95.00 | €1,425.00 | €356.25 | €1,781.25 |
| B-016Underfloor heating loops and controls | 120 | m² | €55.00 | €6,600.00 | €1,650.00 | €8,250.00 |
| B-017Compact air-to-water heat-pump allowance | 1 | item | €6,500.00 | €6,500.00 | €1,625.00 | €8,125.00 |
| B-018Fan-coil units | 3 | item | €1,100.00 | €3,300.00 | €825.00 | €4,125.00 |
| B-019Bathroom extract units | 2 | item | €650.00 | €1,300.00 | €325.00 | €1,625.00 |
| B-020Extract ductwork | 28.5 | m | €22.00 | €627.00 | €156.75 | €783.75 |
| B-021Fire stopping at service penetrations | 12 | item | €38.00 | €456.00 | €114.00 | €570.00 |
| B-022Domestic water filter | 1 | item | €650.00 | €650.00 | €162.50 | €812.50 |
| CO-001-1Additional concealed stack replacement | 12 | m | €120.00 | €1,440.00 | €360.00 | €1,800.00 |
| CO-001-2Additional lower-wall tanking layer | 40 | m² | €45.00 | €1,800.00 | €450.00 | €2,250.00 |
| CO-001-3Inspection chamber allowance | 1 | item | €800.00 | €800.00 | €200.00 | €1,000.00 |
| CO-001-4Retesting after remedial work | 1 | lot | €600.00 | €600.00 | €150.00 | €750.00 |
Including VAT€51,797.50
Partitions, plaster and decoration
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-023New plasterboard partitions | 65 | m² | €48.00 | €3,120.00 | €780.00 | €3,900.00 |
| B-024Lime-plaster repair and preparation | 300 | m² | €28.00 | €8,400.00 | €2,100.00 | €10,500.00 |
| B-025Plasterboard ceilings including basic mineral-wool infill | 80 | m² | €35.00 | €2,800.00 | €700.00 | €3,500.00 |
| B-026Final wall and ceiling decoration | 420 | m² | €10.00 | €4,200.00 | €1,050.00 | €5,250.00 |
Including VAT€23,150.00
Exterior and interior joinery
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-027Restore exterior timber opening units | 4 | opening | €2,500.00 | €10,000.00 | €2,500.00 | €12,500.00 |
| B-028Internal doors and ironmongery | 6 | item | €650.00 | €3,900.00 | €975.00 | €4,875.00 |
Including VAT€17,375.00
Flooring, tiling and sanitaryware
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-029Wet-zone waterproofing beneath tiles | 40 | m² | €22.00 | €880.00 | €220.00 | €1,100.00 |
| B-030Porcelain tiling labour and setting materials | 60 | m² | €48.00 | €2,880.00 | €720.00 | €3,600.00 |
| B-031Porcelain tile supply | 60 | m² | €52.00 | €3,120.00 | €780.00 | €3,900.00 |
| B-032Engineered oak flooring, supply and fit | 95 | m² | €95.00 | €9,025.00 | €2,256.25 | €11,281.25 |
| B-033Stone thresholds | 12 | m | €90.00 | €1,080.00 | €270.00 | €1,350.00 |
| B-034Sanitaryware, taps and shower glass, no vanity furniture | 2 | package | €4,200.00 | €8,400.00 | €2,100.00 | €10,500.00 |
Including VAT€31,731.25
Kitchen and fitted storage
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-035Kitchen cabinetry, combined upper/lower measured runs | 7.2 | m | €1,550.00 | €11,160.00 | €2,790.00 | €13,950.00 |
| B-036Kitchen stone worktop | 4.5 | m² | €650.00 | €2,925.00 | €731.25 | €3,656.25 |
| B-037Kitchen appliances allowance | 1 | package | €5,200.00 | €5,200.00 | €1,300.00 | €6,500.00 |
| B-038Bedroom fitted wardrobes | 9 | m | €680.00 | €6,120.00 | €1,530.00 | €7,650.00 |
| B-039Bathroom vanity furniture | 2 | item | €1,100.00 | €2,200.00 | €550.00 | €2,750.00 |
| B-040Study and storage oak shelving | 7 | m | €280.00 | €1,960.00 | €490.00 | €2,450.00 |
Including VAT€36,956.25
Lighting and loose furniture
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-041Decorative light fittings | 24 | item | €150.00 | €3,600.00 | €900.00 | €4,500.00 |
| B-042Visible switch/socket accessories | 60 | item | €35.00 | €2,100.00 | €525.00 | €2,625.00 |
| B-043Living-room sofa | 1 | item | €2,400.00 | €2,400.00 | €600.00 | €3,000.00 |
| B-044Dining table | 1 | item | €1,600.00 | €1,600.00 | €400.00 | €2,000.00 |
| B-045Dining chairs | 6 | item | €240.00 | €1,440.00 | €360.00 | €1,800.00 |
| B-046Bed frames | 2 | item | €950.00 | €1,900.00 | €475.00 | €2,375.00 |
| B-047Mattresses | 2 | item | €600.00 | €1,200.00 | €300.00 | €1,500.00 |
| B-048Study desk | 1 | item | €650.00 | €650.00 | €162.50 | €812.50 |
| B-049Curtain fabric and installation | 28 | m² | €65.00 | €1,820.00 | €455.00 | €2,275.00 |
Including VAT€20,887.50
Terrace and local garden works
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-050Lift and prepare terrace paving base | 24 | m² | €28.00 | €672.00 | €168.00 | €840.00 |
| B-051Terrace waterproofing system | 24 | m² | €35.00 | €840.00 | €210.00 | €1,050.00 |
| B-052Threshold drainage channel | 1 | item | €720.00 | €720.00 | €180.00 | €900.00 |
| B-053Baseline terrace paving, supply and fit | 24 | m² | €85.00 | €2,040.00 | €510.00 | €2,550.00 |
| B-054Local garden reinstatement | 1 | lot | €1,200.00 | €1,200.00 | €300.00 | €1,500.00 |
| B-055Restore existing stone balustrade | 14 | m | €85.00 | €1,190.00 | €297.50 | €1,487.50 |
Including VAT€8,327.50
Coordination and close-out
| Document | Quantity | Unit | Unit rate | Before VAT | VAT | Including VAT |
|---|---|---|---|---|---|---|
| B-056Operational project coordination | 16 | week | €1,150.00 | €18,400.00 | €4,600.00 | €23,000.00 |
| B-057Testing and commissioning | 1 | lot | €2,200.00 | €2,200.00 | €550.00 | €2,750.00 |
| B-058Final cleaning and handover preparation | 120 | m² | €8.00 | €960.00 | €240.00 | €1,200.00 |
Including VAT€26,950.00
Approved total€248,500.00