DEMO · Illustrative project
BuilderBack to portal
P-019 · Revision C29 October 2026

Project brief and design intent

Villa Kvarner · Opatija / 2026-014

Interior
120 m²
Terrace
24 m²
Planned handover
12 Dec 2026

Project scope

A 120 m² garden residence within an existing Opatija villa, plus a 24 m² terrace. The original structure stays; interiors, services and finishes are renewed.

  • Renew interiors and services within the retained 1930s shell.
  • Restore four exterior timber opening units; retain their original geometry.
  • Fit kitchen, sanitaryware, storage and basic furniture to the room schedule.
  • Waterproof and repave the 24 m² terrace; protect the existing garden and balustrade.

No new-build, pool, structural extension or whole-villa roof replacement.

Room schedule

Room schedule
Room / zoneArea
L01 · Living / dining / kitchen42 m²
B01 · Main bedroom18 m²
B02 · Bedroom two12 m²
S01 · Study / guest room11 m²
W01 · Main bathroom7 m²
W02 · Ensuite4 m²
H01 · Hall and circulation14 m²
U01 · Utility / laundry6 m²
ST01 · Storage6 m²
Interior120 m²
Terrace24 m²

Design proposals

Living-zone design target
L01 · 12 Sept 2026Design proposal

Living-zone design target

Proposed finishes and furniture layout for the living zone.

Bathroom design target
W01 · 12 Sept 2026Design proposal

Bathroom design target

Proposed sanitaryware and finishes, awaiting selection approval.

Terrace option A — pending selection
T01 · 12 Sept 2026Design proposal

Terrace option A — pending selection

Warm-stone finish option A, pending decision D-021 (€2,400).